Difference between revisions of "Analysis shift"
From GlueXWiki
(→Shift Schedule) |
|||
Line 1: | Line 1: | ||
=== Shift Schedule === | === Shift Schedule === | ||
− | * [ | + | * [https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Link to shift schedule] |
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. | * Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. | ||
− | * A remote connection is available on zoom at all times: | + | * A remote connection is available on zoom at all times: |
− | + | ||
=== Shift Tasks === | === Shift Tasks === |
Revision as of 10:56, 28 September 2021
Shift Schedule
- Link to shift schedule
- Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.
- A remote connection is available on zoom at all times:
Shift Tasks
- [XXX Fill out the run spreadsheet.]
- [XXXX Check and report on the key plots.]