Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(Calibration)
Line 1: Line 1:
 +
=== Experimental Details ===
 +
 
[https://halldweb.jlab.org/wiki/index.php/Run_Wiki Run Wiki] <br>  
 
[https://halldweb.jlab.org/wiki/index.php/Run_Wiki Run Wiki] <br>  
 
[https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Run Plan] <br>
 
[https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Run Plan] <br>
Line 9: Line 11:
  
  
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
+
=== [https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]===
  
 
<br> Responsible for:  
 
<br> Responsible for:  

Revision as of 14:51, 12 November 2021

Experimental Details

Run Wiki
Run Plan
Useful Links

Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
HallD Counting House (join here)


Sign Up for Analysis Shifts


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: here
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.

Calibration

Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

NOTES TO SOLVE (to be edited as they are solved):

  • Igal informed (11/11/2021 05:44) that run 90039 is not in the database accesible by the Python script. But it is in the RCDB. (CA)

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS