Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(Shift Schedule - To be updated!)
Line 3: Line 3:
 
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.  
 
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.  
 
* A remote connection is available on zoom at all times:
 
* A remote connection is available on zoom at all times:
 +
* Daily Analysis meeting to be held at XXX via zoom:
  
 
=== Shift Tasks - To be updated!===
 
=== Shift Tasks - To be updated!===
  
* [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Fill out the run spreadsheet.]  
+
* [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Update and verify the run spreadsheet.]  
* [XXXX Check and report on the key plots.]
+
* Looking at monitoring channels and physics by run on data from batch farm  -- details will be added here to include plots, scripts, and file locations!
 +
* Update the run spreadsheet
 +
* Updates to daily analysis meeting
 +
* Keep count of events on target

Revision as of 22:12, 30 September 2021

Shift Schedule - To be updated!

  • Link to shift schedule
  • Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
  • A remote connection is available on zoom at all times:
  • Daily Analysis meeting to be held at XXX via zoom:

Shift Tasks - To be updated!

  • Update and verify the run spreadsheet.
  • Looking at monitoring channels and physics by run on data from batch farm -- details will be added here to include plots, scripts, and file locations!
  • Update the run spreadsheet
  • Updates to daily analysis meeting
  • Keep count of events on target