Analysis shift

From GlueXWiki
Revision as of 19:43, 10 November 2021 by Psharp (Talk | contribs)

Jump to: navigation, search

Analysis Shift

Note:
CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: TBD
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.


Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins


List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS