Analysis shift
From GlueXWiki
Revision as of 10:50, 28 September 2021 by Hszumila (Talk | contribs) (Created page with "=== Shift Schedule === * [ Link to shift schedule] * Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. * A remote connection is availa...")
Shift Schedule
- [ Link to shift schedule]
- Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.
- A remote connection is available on zoom at all times:
Shift Tasks
- [ Fill out the run spreadsheet.]
- [ Check and report on the key plots.]