Analysis shift

From GlueXWiki
Revision as of 20:49, 10 November 2021 by Psharp (Talk | contribs)

Jump to: navigation, search

Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
HallD Counting House (join here)


Sign Up for Analysis Shifts


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: TBD
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.


Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins


List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS