Analysis shift

From GlueXWiki
Revision as of 11:50, 28 September 2021 by Hszumila (Talk | contribs) (Created page with "=== Shift Schedule === * [ Link to shift schedule] * Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. * A remote connection is availa...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Shift Schedule

  • [ Link to shift schedule]
  • Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.
  • A remote connection is available on zoom at all times:


Shift Tasks

  • [ Fill out the run spreadsheet.]
  • [ Check and report on the key plots.]