Analysis shift

From GlueXWiki
Revision as of 14:42, 10 November 2021 by Psharp (Talk | contribs)

Jump to: navigation, search

Analysis Shift

CC Room 306 is ours to use throughout the experiment for collaboration and work. Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171

Sign Up for Analysis Shifts Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.

Tasks of Analysis Shift Work:

  • Update and verify the run spreadsheet.
  • Ensure data quality run-by-run Document here
  • Looking at monitoring channels and physics by run on data from batch farm. Good plots to compare with are here.
  • Check plots here
  • Monitoring Launch Checks: individuals contact subsystem expert for any issues: subsystem teams
  • Update the run spreadsheet
  • Updates to daily analysis meeting
  • Keep count of events on target - add script details here

Summary Physics Shift Analysis

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS