Analysis shift

From GlueXWiki
Revision as of 14:59, 10 November 2021 by Psharp (Talk | contribs) (Analysis Shift)

Jump to: navigation, search

Analysis Shift

Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).


Responsible for:


CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171

Physics Shift

(Will be merged with Analysis Shift) Responsible for:

  • Running

Summary Physics Shift Analysis

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS