Difference between revisions of "Apr. 4, 2008 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Added magnetic field study)
Line 12: Line 12:
 
# CDC stereo configuration optimization
 
# CDC stereo configuration optimization
 
# Study dependence on magnetic field map
 
# Study dependence on magnetic field map
# Tabulate full covariance matrices with tracking resolutions
 
 
# Include material in fitter (Kalman?)
 
# Include material in fitter (Kalman?)
 
# Full tracking efficiencies
 
# Full tracking efficiencies
 +
# Address known problems in current fitter
 +
#* Particle charge mis-assignment
 +
#* Matching of CDC/FDC track candidates
 +
#* Fit results is visually worse than candidate
 +
#* ...
 +
# Tabulate full covariance matrices with tracking resolutions
 
# HDParSim
 
# HDParSim
  

Revision as of 13:14, 3 April 2008

Agenda

  1. Discuss review results (All)
  2. Plan for next 6 months (All)



Simulation/Reconstruction Projects

  1. CDC length/FDC position optimization
  2. CDC stereo configuration optimization
  3. Study dependence on magnetic field map
  4. Include material in fitter (Kalman?)
  5. Full tracking efficiencies
  6. Address known problems in current fitter
    • Particle charge mis-assignment
    • Matching of CDC/FDC track candidates
    • Fit results is visually worse than candidate
    • ...
  7. Tabulate full covariance matrices with tracking resolutions
  8. HDParSim



Participating

Location

The meeting will be at 11:00am in Cebaf Center F326-327.

Telephone

To connect by telephone: 1.) dial:

800-377-8846 : US
888-276-7715 : Canada
302-709-8424 : International (not a free call!)

2.) enter participant code: 39527048# (remember the "#")

Video Conferencing

We will attempt an ESNet connection for this meeting using the following number:

8542553

We have a reasonable expectation that this will work.

Minutes

Attendees: TBD