Apr 07, 2011 Calibration/Monitoring

From GlueXWiki
Revision as of 11:07, 7 April 2011 by Zisis (Talk | contribs) (Minutes)

Jump to: navigation, search

Teleconference Time: 08:00 CST (Regina) / 10:00 EDT / 16:00 GMT+2 (Athens)

  • Connection: ESNET

Background information

Action Items

  1. Can George calculate the % deviation from linearity on his plot?
  2. USM should be contacted to send more LGs to Athens: Athens has requested 15 units, 12 for one side and 3 for the opposing side of the baby cal. Regina is working on its request.
  3. Christina will probe Kapos for cabling and other board issues.

Tentative Agenda

  1. MoU Progress
  2. Monitoring system concepts

Minutes

Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)

  1. Prototyping:
    1. Kappos gave a quote for 2 LPCM boards running 40 LED boards: euro 1600/$2700, $300 including consumables. Very reasonable.
    2. Elton will look into breaking off a small part of the contract soon, to allow work to proceed.
    3. A piece of Plexiglas existed at Athens an will be polished.
  2. MOU
    1. It has been sent to the central offices.
  3. Contract:
    1. Fixed Price Contract.