Difference between revisions of "Apr 12, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 23: | Line 23: | ||
# Announcements | # Announcements | ||
− | |||
# Review of Action Items | # Review of Action Items | ||
# Calibration | # Calibration | ||
# FCAL | # FCAL | ||
## Construction Status: mechanical, bases | ## Construction Status: mechanical, bases | ||
− | |||
# BCAL | # BCAL | ||
## Construction Status: builds, fibre QA | ## Construction Status: builds, fibre QA |
Revision as of 17:20, 11 April 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: check cross talk of calibration inputs across modules.
- Simulation
- Need to study the reconstruction efficiency.
- Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg.
- SiPMs
- Re-measure original SiPM sample to verify rates are in fact lower for new arrays
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- FCAL
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- First article testing (Yi)
- Simulations
Minutes
Attending: