Difference between revisions of "Apr 16, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
Line 18: Line 18:
 
= Documents to Review=
 
= Documents to Review=
  
# Fiber Summaries (JLab)
 
#* [[Media:Light_output.png|Kuraray measurements of light output]] 
 
#* [[Media:Atten.png|Kuraray measurements of attenuation length]]
 
# Fiber Measurements
 
#* [[Kuraray Fibre Tests| Kuraray Fibre Tests - Regina]]
 
# Simulation of BCAL Threshold [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1231 GlueX-doc-1231]
 
 
# Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.
 
# Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.
  

Revision as of 13:02, 3 April 2009

Teleconference Time: 11:00 a.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. From stand-alone MC, or previous notes, collect the distribution of photons expected for numbers of photons for various showers (especially at low energies, e.g. 50 MeV - 200 MeV) and typicall positions (i.e angles) along the calorimeter. (Andrei).
  4. JLab to have some informal discussions on various cooling concepts to be presented at the next meeting.[http://www.jlab.org/~huttonc/siPM_layout.ppt cooling}

Documents to Review

  1. Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. Simulations
  4. BCAL Update
    1. Preparations for construction
    2. Cooling of BCAL Readout
  5. Review of Action Items

Minutes