Difference between revisions of "Apr 16, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting)
(Tentative Agenda)
Line 20: Line 20:
  
 
# Announcements
 
# Announcements
 +
# Calibration (Athens)
 +
#* [[http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1236 LED layout]
 
# FCAL Update
 
# FCAL Update
 
# Simulations
 
# Simulations

Revision as of 09:33, 15 April 2009

Teleconference Time: 11:00 a.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Calibration (Athens)
  3. FCAL Update
  4. Simulations
  5. BCAL Update
    1. Preparations for construction
    2. Cooling of BCAL Readout
  6. Review of Action Items

Minutes