Difference between revisions of "Apr 16, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 33: Line 33:
  
 
=Minutes=
 
=Minutes=
 +
 +
# Announcements
 +
# Calibration (Athens)
 +
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1236 LED layout]
 +
# FCAL Update
 +
# Simulations
 +
# BCAL Update
 +
## Preparations for construction
 +
## Cooling of BCAL Readout
 +
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 Sensitivity to voltage temperature] (Elton)
 +
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1235 Update on Hamamatsu and Sensl Sipms] PPT: [http://www.jlab.org/~zihlmann/SiPM_MPPC_update.ppt] (Carl)
 +
# Agenda Collab. Meeting [http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX-Collaboration-May-2009]
 +
# Review of Action Items

Revision as of 15:45, 16 April 2009

Teleconference Time: 11:00 a.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Calibration (Athens)
  3. FCAL Update
  4. Simulations
  5. BCAL Update
    1. Preparations for construction
    2. Cooling of BCAL Readout
    3. Update on Hamamatsu and Sensl Sipms PPT: [1] (Carl)
  6. Agenda Collab. Meeting [2]
  7. Review of Action Items

Minutes

  1. Announcements
  2. Calibration (Athens)
  3. FCAL Update
  4. Simulations
  5. BCAL Update
    1. Preparations for construction
    2. Cooling of BCAL Readout
    3. Update on Hamamatsu and Sensl Sipms PPT: [3] (Carl)
  6. Agenda Collab. Meeting [4]
  7. Review of Action Items