Difference between revisions of "Apr 2, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 25: Line 25:
 
# FCAL Update
 
# FCAL Update
 
# BCAL Update
 
# BCAL Update
## Results of Fiber Tests
 
 
## Preparations for construction
 
## Preparations for construction
 +
## Results of Fiber Tests
 
## Cooling of BCAL Readout
 
## Cooling of BCAL Readout
 
# Simulations
 
# Simulations

Revision as of 09:46, 1 April 2009

Teleconference Time: 4:45 p.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. From stand-alone MC, or previous notes, collect the distribution of photons expected for numbers of photons for various showers (especially at low energies, e.g. 50 MeV - 200 MeV) and typicall positions (i.e angles) along the calorimeter. (Andrei).
  4. JLab to have some informal discussions on various cooling concepts to be presented at the next meeting.

Documents to Review

  1. Fiber Summaries

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. BCAL Update
    1. Preparations for construction
    2. Results of Fiber Tests
    3. Cooling of BCAL Readout
  4. Simulations
    1. BCAL Dark Hits (Matt)
  5. Review of Action Items

Minutes