Difference between revisions of "Apr 2, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Tentative Agenda)
Line 30: Line 30:
 
# FCAL Update
 
# FCAL Update
 
# Simulations
 
# Simulations
 +
## Simulation of BCAL Threshold [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1231 GlueX-doc-1231] (Matt)
 
## BCAL Dark Hits (Matt)
 
## BCAL Dark Hits (Matt)
 
### [[Media:Res_vs_dkrate.pdf | Resolution Dependence on Dark Rate]]
 
### [[Media:Res_vs_dkrate.pdf | Resolution Dependence on Dark Rate]]

Revision as of 16:25, 2 April 2009

Teleconference Time: 4:45 p.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. From stand-alone MC, or previous notes, collect the distribution of photons expected for numbers of photons for various showers (especially at low energies, e.g. 50 MeV - 200 MeV) and typicall positions (i.e angles) along the calorimeter. (Andrei).
  4. JLab to have some informal discussions on various cooling concepts to be presented at the next meeting.[http://www.jlab.org/~huttonc/siPM_layout.ppt cooling}

Documents to Review

  1. Fiber Summaries (JLab)
  2. Fiber Measurements
  3. Simulation of BCAL Threshold GlueX-doc-1231

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. Simulations
    1. Simulation of BCAL Threshold GlueX-doc-1231 (Matt)
    2. BCAL Dark Hits (Matt)
      1. Resolution Dependence on Dark Rate
      2. π0 Peak for Different Dark Rates
  4. BCAL Update
    1. Preparations for construction
    2. Results of Fiber Tests
    3. Cooling of BCAL Readout
  5. Review of Action Items

Minutes