''Attending:
+
''Attending: Curtis, Chandra, Jon, Karthik, Sean, Susan, Tolga, Varun, Zisis, Mark, Foda, Christina, Matt, Sasha
  
 
# Announcements
 
# Announcements
Line 69: Line 69:
 
# Action Items
 
# Action Items
 
# Run Updates
 
# Run Updates
## FCAL
+
## General : The accelerator shutdown under MEDCON6 on Tuesday March 24. Complete shutdown procedures were followed. All electreronics has been powered down. Mark said that the chillers were also turned off. The nitrogen flow was left on the BCAL. Daily walkthrus of all end-stations are being conducted by handful of authorized personnel. See log books for status.
## BCAL
+
 
# Calibrations
 
# Calibrations
## PrimEx gain calibration [https://halldweb.jlab.org/wiki/images/b/bd/PrimExGainCalib.pdf PrimEx Gain update]
 
 
## Spring 2020 GlueX gain calibration  
 
## Spring 2020 GlueX gain calibration  
 
### Calibrated for the batch1 runs- 71350 - 71591
 
### Calibrated for the batch1 runs- 71350 - 71591
 
### Started with Fall 2018 gains with Mark's gain ratios applied to it.
 
### Started with Fall 2018 gains with Mark's gain ratios applied to it.
 
### So far 12 Iterations are done. The gain procedure is going smooth until now. [https://halldweb.jlab.org/wiki/images/1/15/Pi0gainmatrixspring2020.pdf gainsSpring2020]
 
### So far 12 Iterations are done. The gain procedure is going smooth until now. [https://halldweb.jlab.org/wiki/images/1/15/Pi0gainmatrixspring2020.pdf gainsSpring2020]
# Monitoring
+
### Resolution after 12 iterations is as good or better than previous calibrations (sigma/mean~0.058).
 +
### Elton: The change in gain appears to be on the order of 25% compared to  original base. It would be nice to understand this. Sean: How much have the gain rations changed? Zisis: They will investigate the changes in the gains in the ccdb. Mark: will look into the gain ratios for previous runs.
 +
### Karthik: Will require 3-4 more iterations before we tighten the uniformity of pi0 mass compared to previous calibrations. After that , the non-linearity correction will be needed.
 +
## PrimEx gain calibration [https://halldweb.jlab.org/wiki/images/b/bd/PrimExGainCalib.pdf PrimEx Gain update]
 +
### Karthik presented the reconstructed pi0 peak for various PRIMEX periods compared to the 2018 calibration. The peak is consistently low at 130 MeV. The pi0 peak in layer 3 is practically absent.
 +
### There was considerable discussion about possible causes and ways to investigate them. Differences from normal production include no magnetic field and no tracking for some periods. The lack of field can lead to increase in charged hadronic background.
 +
### Curtis: Checking events on the event viewer show that most tracks are noise and many show curvature. Matt: What is the residual field in the magnet when turned off?
 +
some of the runs.# Monitoring
 
# Reconstruction
 
# Reconstruction
 
# Efficiencies
 
# Efficiencies

Revision as of 15:53, 2 April 2020

Meeting Time: 11:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at east 5 MeV.
  3. Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Check switches on FCAL board with high scaler rates and make sure it is set to 2 V full scale. (Colin and Sasha)
  2. Move monitoring plots of the FCAL/BCAL front panel triggers into FCAL/BCAL monitoring section (Zisis) Zisis has worked Varun to develop the plots. They will report on this next week.
  3. <strikComplete calibrations by April 1? See 2020 Data Productione> </strike> Karthik has almost completed the task for batch 1.

Long term items

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Run Updates
    1. FCAL
    2. BCAL
  4. Calibrations
    1. PrimEx gain calibration PrimEx Gain update
    2. Spring 2020 GlueX gain calibration
      1. Calibrated for the batch1 runs- 71350 - 71591
      2. Started with Fall 2018 gains with Mark's gain ratios applied to it.
      3. So far 12 Iterations are done. The gain procedure is going smooth until now. gainsSpring2020
  5. Monitoring
  6. Reconstruction
  7. Efficiencies
  8. Simulations
  9. NIM articles
  10. Any other business

Minutes

Attending: Curtis, Chandra, Jon, Karthik, Sean, Susan, Tolga, Varun, Zisis, Mark, Foda, Christina, Matt, Sasha

  1. Announcements
  2. Action Items
  3. Run Updates
    1. General : The accelerator shutdown under MEDCON6 on Tuesday March 24. Complete shutdown procedures were followed. All electreronics has been powered down. Mark said that the chillers were also turned off. The nitrogen flow was left on the BCAL. Daily walkthrus of all end-stations are being conducted by handful of authorized personnel. See log books for status.
  4. Calibrations
    1. Spring 2020 GlueX gain calibration
      1. Calibrated for the batch1 runs- 71350 - 71591
      2. Started with Fall 2018 gains with Mark's gain ratios applied to it.
      3. So far 12 Iterations are done. The gain procedure is going smooth until now. gainsSpring2020
      4. Resolution after 12 iterations is as good or better than previous calibrations (sigma/mean~0.058).
      5. Elton: The change in gain appears to be on the order of 25% compared to original base. It would be nice to understand this. Sean: How much have the gain rations changed? Zisis: They will investigate the changes in the gains in the ccdb. Mark: will look into the gain ratios for previous runs.
      6. Karthik: Will require 3-4 more iterations before we tighten the uniformity of pi0 mass compared to previous calibrations. After that , the non-linearity correction will be needed.
    2. PrimEx gain calibration PrimEx Gain update
      1. Karthik presented the reconstructed pi0 peak for various PRIMEX periods compared to the 2018 calibration. The peak is consistently low at 130 MeV. The pi0 peak in layer 3 is practically absent.
      2. There was considerable discussion about possible causes and ways to investigate them. Differences from normal production include no magnetic field and no tracking for some periods. The lack of field can lead to increase in charged hadronic background.
      3. Curtis: Checking events on the event viewer show that most tracks are noise and many show curvature. Matt: What is the residual field in the magnet when turned off?

some of the runs.# Monitoring

  1. Reconstruction
  2. Efficiencies
  3. Simulations
  4. NIM articles
  5. Any other business