Difference between revisions of "Apr 26, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 33: Line 33:
 
## Construction Status: builds, fibre QA
 
## Construction Status: builds, fibre QA
 
# [[GlueX-Collaboration-May-2011 | Collaboration Meeting Presentations]]
 
# [[GlueX-Collaboration-May-2011 | Collaboration Meeting Presentations]]
 +
* Tuesday 14:30  Session IVa (120) --- Calorimetry - (Organizer: Matt Shepherd) - Chair:
 +
** 14:30 (30) --- 
 +
** 15:00 (30) ---
 +
** 15:30 (30) ---
 +
** 16:00 (30) ---
 
# Simulations
 
# Simulations
 
#* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David)
 
#* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David)

Revision as of 08:40, 26 April 2011

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate.
  2. Simulation
    • Need to study the reconstruction efficiency.
    • Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg. Ongoing studies.
    • Check timing resolution at 90 deg compared to beam test
    • Check inefficiencies compared to previous studies by Mihajlo.
  3. SiPMs
    • Re-measure original SiPM sample to verify rates are in fact lower for new arrays

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status: mechanical, bases
    2. Photos of Base Testing
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Collaboration Meeting Presentations
  • Tuesday 14:30 Session IVa (120) --- Calorimetry - (Organizer: Matt Shepherd) - Chair:
    • 14:30 (30) ---
    • 15:00 (30) ---
    • 15:30 (30) ---
    • 16:00 (30) ---
  1. Simulations
  2. SiPM First Article (Yi)
  3. Timing and rate measurements of SiPMs (Baturin)

Minutes

Attending: