Difference between revisions of "Apr 26, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Tentative Agenda)
Line 31: Line 31:
 
# BCAL
 
# BCAL
 
## Construction Status: builds, fibre QA
 
## Construction Status: builds, fibre QA
## First article testing (Yi)
+
# Collaboration Meeting Presentations
 
# Simulations
 
# Simulations
 
#* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David)
 
#* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David)
 +
# SiPM First Article (Yi)
 +
# [http://www.jlab.org/~baturin/ASIPM-PMT-COMPARISON-APR2011.pdf Timing and rate measurements of SiPMs] (Baturin)
  
 
=Minutes=
 
=Minutes=
 
''Attending:
 
''Attending:

Revision as of 07:19, 26 April 2011

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate.
  2. Simulation
    • Need to study the reconstruction efficiency.
    • Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg. Ongoing studies.
    • Check timing resolution at 90 deg compared to beam test
    • Check inefficiencies compared to previous studies by Mihajlo.
  3. SiPMs
    • Re-measure original SiPM sample to verify rates are in fact lower for new arrays

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status: mechanical, bases
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Collaboration Meeting Presentations
  7. Simulations
  8. SiPM First Article (Yi)
  9. Timing and rate measurements of SiPMs (Baturin)

Minutes

Attending: