Difference between revisions of "Apr 30, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Tentative Agenda)
Line 26: Line 26:
 
## Preparations for construction
 
## Preparations for construction
 
## BCAL Readout
 
## BCAL Readout
 +
##* Final report on First-article fibers (Zisis)
 +
##* Review of specifications for readout (Elton)
 
# Agenda [[GlueX-Collaboration-May-2009]]
 
# Agenda [[GlueX-Collaboration-May-2009]]
 
# Review of Action Items
 
# Review of Action Items
  
 
=Minutes=
 
=Minutes=

Revision as of 16:46, 29 April 2009

Teleconference Time: 11:00 a.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. Simulations
  5. BCAL Update
    1. Preparations for construction
    2. BCAL Readout
      • Final report on First-article fibers (Zisis)
      • Review of specifications for readout (Elton)
  6. Agenda GlueX-Collaboration-May-2009
  7. Review of Action Items

Minutes