Difference between revisions of "Apr 30, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Tentative Agenda)
Line 28: Line 28:
 
# BCAL Update
 
# BCAL Update
 
## Preparations for construction
 
## Preparations for construction
## BCAL Readout
 
 
##* Final report on First-article fibers (Zisis)
 
##* Final report on First-article fibers (Zisis)
 +
## BCAL Readout
 
##* Review of specifications for readout (Elton)
 
##* Review of specifications for readout (Elton)
 
# Agenda [[GlueX-Collaboration-May-2009]]
 
# Agenda [[GlueX-Collaboration-May-2009]]

Revision as of 18:25, 29 April 2009

Teleconference Time: 11:00 a.m. EST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.

Documents to Review

  1. GlueX-doc-795 Bcal Readout Specs
  2. GlueX-doc-1214 SiPM Cooling

Tentative Agenda

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. Simulations
  5. BCAL Update
    1. Preparations for construction
      • Final report on First-article fibers (Zisis)
    2. BCAL Readout
      • Review of specifications for readout (Elton)
  6. Agenda GlueX-Collaboration-May-2009
  7. Review of Action Items

Minutes