Apr 30, 2009 Calorimetry

From GlueXWiki
Revision as of 14:50, 30 April 2009 by Elton (Talk | contribs)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.

Documents to Review

  1. GlueX-doc-795 Bcal Readout Specs
  2. GlueX-doc-1214 SiPM Cooling

Tentative Agenda

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. Simulations
  5. BCAL Fabrication
    • Preparations for construction
    • Final report on First-article fibers (Zisis)
  6. BCAL Readout
  7. Agenda GlueX-Collaboration-May-2009 Suggested list to be refined at next working group meeting
    • Fcal update
    • Timing resolution of FADCs
    • Bcal construction
    • Update on Bcal readout
    • Report on tests of first article fibers
  8. Review of Action Items

Minutes

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. Simulations
  5. BCAL Fabrication
    • Preparations for construction
    • Final report on First-article fibers (Zisis)
  6. BCAL Readout
  7. Agenda GlueX-Collaboration-May-2009 Suggested list to be refined at next working group meeting
    • Fcal update
    • Timing resolution of FADCs
    • Bcal construction
    • Update on Bcal readout
    • Report on tests of first article fibers
  8. Review of Action Items