Difference between revisions of "Apr 5, 2011 Readout"

From GlueXWiki
Jump to: navigation, search
m (Apr 4, 2011 Readout moved to Apr 5, 2011 Readout: wrong date)
(Tentative Agenda)
Line 23: Line 23:
 
# Review of Action Items
 
# Review of Action Items
 
# USM update
 
# USM update
# Simulations
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1715 Electrical/cooling] (Elton)
 
# Geometry and light guides
 
 
# SiPM update
 
# SiPM update
## First Article testing [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110322.pptx Update]
+
# Electrical/cooling (Elton)
 +
# Geometry and light guides
 +
# Simulations
  
 
= Minutes =
 
= Minutes =
 
''Attending:
 
''Attending:

Revision as of 14:17, 4 April 2011

Teleconference Time: 11:00 a.m. EST

  • ESNET 8542553 and EVO session
  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone:
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Items for followup from previous meeting

  1. Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap.
  2. Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM update
  4. SiPM update
  5. Electrical/cooling (Elton)
  6. Geometry and light guides
  7. Simulations

Minutes

Attending: