Difference between revisions of "April 1, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Thursday April 1, 2020, 1pm Bluejeans * Present - Elton, Dave, Stephanie, Llya, Rory (remote) == Agenda == * Minutes from last meeting https://ha...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
= Meeting Time and Place ==
 
= Meeting Time and Place ==
Thursday April 1, 2020, 1pm
+
Thursday April 2, 2020, 1pm
 
Bluejeans
 
Bluejeans
  
Line 10: Line 10:
 
* 3D model  
 
* 3D model  
 
* Things to work out
 
* Things to work out
** Determine location of cable trays under platform
+
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]
 +
** Grounding
 
** Complete structural analysis
 
** Complete structural analysis
 
** Develop installation plan
 
** Develop installation plan
** Determine location of existing feedthru on North side of dark room
 
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
* Go to hall and look at cable tray locations (Stephanie and Tim)
+
*
* Take actual dimensions from Muon chamber in hall (Stephanie, Tim)
+
* Go inside Dark room to verify what exists and has to be moved (Stephanie, Tim)
+
* Need space for foil box to cover electronics (Rory will send sketch)
+
* Dave Lawrence will supply sketches of the complete chamber
+
* Verify dimensions to racks to get rail as close as we can (Stephanie)
+
* We can use steel encased lead available at the lab for the US plate. 2" lead and 1/4" steel surrounding it.
+
* Definitely wish to pursue being able to move the CPP with the FCAL platform
+

Latest revision as of 09:12, 2 April 2020

Meeting Time and Place =

Thursday April 2, 2020, 1pm Bluejeans

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items