Difference between revisions of "April 1, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(6 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
== Agenda ==
 
== Agenda ==
 
* Safety - fuel spill
 
* Safety - fuel spill
 +
* OccMed DR on site now
 +
* Run around May 25
 
* Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]]
 
* Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]]
 
** CPP INstall  O:\halld_engineering\Installation Schedules
 
** CPP INstall  O:\halld_engineering\Installation Schedules
*** Microscope move/Hodoscope plate #7
+
*** Microscope move/Hodoscope plate #7 [[image:hodo_paddle.png|thumb]]
 
*** Moveable Lead absorber
 
*** Moveable Lead absorber
*** Target - Bobby [[image:CPP_Target_fid.png|thumb]]
+
*** Target - Bobby [[Media:CPP_Target_fid.pdf]]
 
*** Gas - Scot
 
*** Gas - Scot
 
*** Helium bag [[Media:CPP_He_Bag.pdf]]
 
*** Helium bag [[Media:CPP_He_Bag.pdf]]
** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
 
** FDC and Target heat exchanger - Josh
 
 
** PS Parasitic Detectors stages  
 
** PS Parasitic Detectors stages  
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication
 
*** 40 brass straps per week needed
 
*** 40 brass straps per week needed
*** Honing test a few steel shields
+
*** matching mu metal to steel shields
*** Sasha wants help matching mu metal to steel shields
+
*** cutting tool
 
** Tagger NMR repair - Scot
 
** Tagger NMR repair - Scot
 
** FDC chiller repair - Josh
 
** FDC chiller repair - Josh
 
** BCAL Coldshot Chiller commissioning - Josh
 
** BCAL Coldshot Chiller commissioning - Josh
 
** Target Turbo repair - Keith
 
** Target Turbo repair - Keith
** TEDF move in late April to EEL stockroom area
+
** TEDF move in May to EEL stockroom area
 
* JT file creation
 
* JT file creation
 
* FCAL Insert Drawings
 
* FCAL Insert Drawings
 +
* New Polarimeter install
 +
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]]
 
* Controls
 
* Controls
 
** Solenoid vacuum controls
 
** Solenoid vacuum controls
 
* General Maintenance
 
* General Maintenance
* On Call - Chris
+
* On Call - Scot
 
* ePAS Training and trial  https://www.jlab.org/esh/epas
 
* ePAS Training and trial  https://www.jlab.org/esh/epas
  
 
== Action Items ==
 
== Action Items ==
  
* Set up PS parasitic meeting
+
* Set up next PS parasitic meeting
 
* Decide on Goni maintenance
 
* Decide on Goni maintenance
* Delineate ePAS permit requests for CPP install HDList
+
* Delineate ePAS permit requests for Isolation Certificate

Latest revision as of 08:29, 1 April 2022

Meeting Time and Place =

Friday April 1, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - fuel spill
  • OccMed DR on site now
  • Run around May 25
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • FDC chiller repair - Josh
    • BCAL Coldshot Chiller commissioning - Josh
    • Target Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation
  • FCAL Insert Drawings
  • New Polarimeter install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Scot
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up next PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for Isolation Certificate