Difference between revisions of "April 12, 2013 Installation"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 29: | Line 29: | ||
# Tagger Array Installation | # Tagger Array Installation | ||
# Pair Spectrometer Installation | # Pair Spectrometer Installation | ||
− | # BCAL Installation | + | # BCAL Installation ([[Media:BCAL assy.jpg | BCAL assy in hall]]) |
# FCAL Insatllation | # FCAL Insatllation | ||
# TOF Installation | # TOF Installation |
Revision as of 12:02, 12 April 2013
Meeting Time and Place
Friday, April 12, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone (supported on request only) dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Up to GlueX/Hall-D Installation Meetings
Action Items From Last Meeting
Agenda
- Announcements
- Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
- Electronics Installation Schedule (Fernando) [| Schedule]
- Magnet Mapping (Tim)
- Tagger Magnet Installation ( Vacuum chamber test fit)
- Microscope Installation
- Tagger Array Installation
- Pair Spectrometer Installation
- BCAL Installation ( BCAL assy in hall)
- FCAL Insatllation
- TOF Installation
- FDC Installation
- CDC Installation
- A.O.B.