Difference between revisions of "April 15, 2011 Design/Fab mtg"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(3 intermediate revisions by the same user not shown)
Line 23: Line 23:
 
** Upstream Platform install
 
** Upstream Platform install
 
** BCAL wedge inspection
 
** BCAL wedge inspection
** BCAL readout prototype
+
** BCAL readout prototype - Graham and Bobby?
 
** LCW installation
 
** LCW installation
 
** Hall D cryogenics design
 
** Hall D cryogenics design
Line 32: Line 32:
 
** Beamline vacuum design/fab/install
 
** Beamline vacuum design/fab/install
 
** Pair spec magnet modification
 
** Pair spec magnet modification
 +
** Tagger fab
 +
** Tagger magnet lift carriage design/fab
  
==Outstanding Action Items==
+
== Action Items==
 
+
 
+
* need to get dipole (for sweep magnet) from FEL - Jim Coleman
+
* need to look at organizing someone to take care of material handling for Hall D. Can we use the transportainer?
+
 
+
* check to see if we can get a MS project group license - Tim
+
* Review upstream platform tie offs, fork maneuver, As builts. rail heights
+
  
 
==Discussions==
 
==Discussions==
  
**In attendance W. Crahen,  J. Fochtman,  C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz,  C. Heck, D. Butler,  W. Sachleben, A. Johnson, G. Biallas,  T. Carstens,  Tim Whitlatch
+
**In attendance W. Crahen,  J. Fochtman,  C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz,  C. Heck, D. Butler,  W. Sachleben, A. Johnson, G. Biallas,  T. Carstens,  Tim Whitlatch, T. Mann, M. Beizer, M. Stevens

Latest revision as of 09:07, 15 April 2011

Meeting Time and Place

Friday April 15, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • ESH&Q minute - Hall D AHA
  • Announcements - FDC Review, Collab mtg
    • training -
    • Manpower
    • Space
    • Budgets
    • Taxes
  • Solenoid Test Status *
  • FDC construction update
  • CAD update
  • Upcoming work
    • FDC Production** Solenoid coil 3 test
    • solenoid coil 2 repair
    • solenoid coil 2 test
    • Collimator cave pedestal install
    • Upstream Platform install
    • BCAL wedge inspection
    • BCAL readout prototype - Graham and Bobby?
    • LCW installation
    • Hall D cryogenics design
    • Solenoid steel design/Fab
    • Solenoid installation into Hall D
    • BCAL assembly tooling design
    • FCAL Platform Design
    • Beamline vacuum design/fab/install
    • Pair spec magnet modification
    • Tagger fab
    • Tagger magnet lift carriage design/fab

Action Items

Discussions

    • In attendance W. Crahen, J. Fochtman, C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz, C. Heck, D. Butler, W. Sachleben, A. Johnson, G. Biallas, T. Carstens, Tim Whitlatch, T. Mann, M. Beizer, M. Stevens