Difference between revisions of "April 15, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Friday April 15 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - ? * Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf ** CP...")
 
(Agenda)
 
(4 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
*** Target - Bobby  - need drawings
 
*** Target - Bobby  - need drawings
 
*** Gas - Scot
 
*** Gas - Scot
*** Helium bag [[Media:Hebag.jpg]]
+
*** Helium bag [[image:He_bag.jpg|thumb]]
** Radiator fork modification
+
 
** PS Parasitic Detectors stages  
 
** PS Parasitic Detectors stages  
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication
Line 19: Line 18:
 
*** cutting tool
 
*** cutting tool
 
** Tagger NMR repair - Scot
 
** Tagger NMR repair - Scot
** FDC chiller repair - Josh
+
** Tagger controls UPS
 
** BCAL Coldshot Chiller commissioning - Josh
 
** BCAL Coldshot Chiller commissioning - Josh
** Target Turbo repair - Keith
+
** Target/Goni Turbo repair - Keith
 
** TEDF move in May to EEL stockroom area
 
** TEDF move in May to EEL stockroom area
* JT file creation
+
* JT file creation - Anthony gave presentation - file and instructions on O drive
 
* FCAL Insert Drawings
 
* FCAL Insert Drawings
 
* New Profiler install
 
* New Profiler install
 
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]]
 
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]]
* Tagger Radiator Mod [[Media:Radiator_mod.pdf]]
+
* Tagger Radiator Mod [[Media:Fork_mod.pdf]]
 
* Controls
 
* Controls
 
** Solenoid vacuum controls
 
** Solenoid vacuum controls

Latest revision as of 10:03, 15 April 2022

Meeting Time and Place =

Friday April 15 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - ?
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move/Hodoscope plate #7 - surveyed 4 mm high - poly shielding?
        Hodo7.png
      • Moveable Lead absorber - Write procedure
      • Target - Bobby - need drawings
      • Gas - Scot
      • Helium bag
        He bag.jpg
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • Tagger controls UPS
    • BCAL Coldshot Chiller commissioning - Josh
    • Target/Goni Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation - Anthony gave presentation - file and instructions on O drive
  • FCAL Insert Drawings
  • New Profiler install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
  • Tagger Radiator Mod Media:Fork_mod.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Scot
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up next PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for Isolation Certificate