April 15, 2022 Tech group SAD meeting

From GlueXWiki
Revision as of 10:03, 15 April 2022 by Whitey (Talk | contribs) (Agenda)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place =

Friday April 15 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - ?
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move/Hodoscope plate #7 - surveyed 4 mm high - poly shielding?
        Hodo7.png
      • Moveable Lead absorber - Write procedure
      • Target - Bobby - need drawings
      • Gas - Scot
      • Helium bag
        He bag.jpg
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • Tagger controls UPS
    • BCAL Coldshot Chiller commissioning - Josh
    • Target/Goni Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation - Anthony gave presentation - file and instructions on O drive
  • FCAL Insert Drawings
  • New Profiler install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
  • Tagger Radiator Mod Media:Fork_mod.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Scot
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up next PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for Isolation Certificate