Difference between revisions of "April 16, 2021 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Friday April 16, 2021<br> 10:00 am, ET<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room sys...") |
(→Agenda) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 19: | Line 19: | ||
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All) | # [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All) | ||
#* Discussion of prototypes and ongoing tests (Bill, All) | #* Discussion of prototypes and ongoing tests (Bill, All) | ||
+ | #** [https://logbooks.jlab.org/entry/3873734 Inspection on 4/13] | ||
#* Next steps in mirror process: (Justin) | #* Next steps in mirror process: (Justin) | ||
#** All strongbacks back from re-anodizing | #** All strongbacks back from re-anodizing | ||
#** Borofloat shipped, mirrors at Danny's to be cut | #** Borofloat shipped, mirrors at Danny's to be cut | ||
− | #** Writeup of assembly procedure in progress to be discussed next week | + | #** Writeup of assembly procedure in progress to be discussed next week (Keith) |
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin) | #* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin) | ||
Line 29: | Line 30: | ||
#* Cherenkov PDF (Ahmed) | #* Cherenkov PDF (Ahmed) | ||
#* FastDIRC update (Yunjie) | #* FastDIRC update (Yunjie) | ||
+ | #* Multiplicity study on per-track photon yields ([https://halldweb.jlab.org/DocDB/0035/003581/003/2021_April_14_Separation_Power_kkpi.pdf Bill]) | ||
# AOB | # AOB |
Latest revision as of 09:56, 16 April 2021
Meeting Information
GlueX DIRC Meeting
Friday April 16, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Mirror prototype test plan (All)
- Discussion of prototypes and ongoing tests (Bill, All)
- Next steps in mirror process: (Justin)
- All strongbacks back from re-anodizing
- Borofloat shipped, mirrors at Danny's to be cut
- Writeup of assembly procedure in progress to be discussed next week (Keith)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status: all 8 batches nearly complete for REST reconstruction (Justin)
- Geometric reconstruction update
- Cherenkov PDF (Ahmed)
- FastDIRC update (Yunjie)
- Multiplicity study on per-track photon yields (Bill)
- AOB