Difference between revisions of "April 19, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 34: Line 34:
 
#** PMT test fixture
 
#** PMT test fixture
 
#** Window procurement
 
#** Window procurement
# Simulation studies (Maria and Roman)
+
# [https://gluexdirc.mit.edu/dirc-time-imaging-reco Simulation studies] (Maria and Roman)
 
# MAPMT testing (Bill)
 
# MAPMT testing (Bill)
 
# AOB
 
# AOB

Revision as of 08:26, 19 April 2018

Meeting Information

GlueX DIRC Meeting
Thursday April 19, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Fall 2018 run start is officially August 21.
    • Expect to complete "low intensity GlueX" by October ~1.
  2. Support structure update (John, Tim, Mark)
    • Roll fixture testing
  3. Bar box transportation
    • Crate fabrication (John)
    • Monitoring system procurements
      • At JLab: 2 additional switches and 6 additional cameras (assembly with plates in progress)
      • LORD accelerometers and base station with Yunjie for testing
      • LED strips?
    • Meeting with SLAC last week
      • Followup on paperwork: radiation control release, property transfer, and work order agreement
  4. Optical box
    • Status update (Ernie and Jason)
      • Box production at Lesker
      • PMT test fixture
      • Window procurement
  5. Simulation studies (Maria and Roman)
  6. MAPMT testing (Bill)
  7. AOB