Difference between revisions of "April 2, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Meeting Time and Place =)
(Minutes and Action Items)
Line 16: Line 16:
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
*
+
*Reviewed minutes of last meeting
 +
* We looked at Rory's pictures and discussed the 3D model that Stephanie shared
 +
* looking at space on platform, we decided to leave the vertical cable managers so we have some space margin in the future
 +
* Need to develop a dimensional layout of 3D model  --  Stephanie
 +
** Note: The chamber currently in the hall has different thickness dimensions than the new ones
 +
** New chambers are 2.09" thick skin to skin
 +
* Need to develop an installation procedure  -- Tim/Stephanie
 +
* Need to separate the 2 DS chambers for the electronics RF shielding
 +
** Rory to supply the gauge and dimensions of the shield

Revision as of 08:06, 6 April 2020

Meeting Time and Place =

Thursday April 2, 2020, 1pm Bluejeans https://bluejeans.com/239719940

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • We looked at Rory's pictures and discussed the 3D model that Stephanie shared
  • looking at space on platform, we decided to leave the vertical cable managers so we have some space margin in the future
  • Need to develop a dimensional layout of 3D model -- Stephanie
    • Note: The chamber currently in the hall has different thickness dimensions than the new ones
    • New chambers are 2.09" thick skin to skin
  • Need to develop an installation procedure -- Tim/Stephanie
  • Need to separate the 2 DS chambers for the electronics RF shielding
    • Rory to supply the gauge and dimensions of the shield