(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Friday April 2, 2021<br> 10:00 am, ET<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room syst...")
 
(Agenda)
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:
 
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All)
 
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All)
 
#* Discussion of prototypes and ongoing tests (Bill, All)
 
#* Discussion of prototypes and ongoing tests (Bill, All)
 +
#** [https://logbooks.jlab.org/entry/3871883 Wednesday's inspection]
 
#* Next steps in mirror process: (Justin)
 
#* Next steps in mirror process: (Justin)
 
#** All strongbacks back from re-anodizing
 
#** All strongbacks back from re-anodizing
 
#** Borofloat ordered, scheduling mirror cutting with Danny's and new template
 
#** Borofloat ordered, scheduling mirror cutting with Danny's and new template
 +
#** New media blasting station in Hall D setup
 
#* Other thoughts or suggestions?
 
#* Other thoughts or suggestions?
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)

Latest revision as of 09:40, 2 April 2021

Meeting Information

GlueX DIRC Meeting
Friday April 2, 2021
10:00 am, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
    • Discussion of prototypes and ongoing tests (Bill, All)
    • Next steps in mirror process: (Justin)
      • All strongbacks back from re-anodizing
      • Borofloat ordered, scheduling mirror cutting with Danny's and new template
      • New media blasting station in Hall D setup
    • Other thoughts or suggestions?
  3. DIRC commissioning analyses and 2020 studies (All)
  4. AOB