Difference between revisions of "April 21, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Tentative Agenda)
Line 27: Line 27:
 
#* Fabrication plan and QA /visit to Alberta?
 
#* Fabrication plan and QA /visit to Alberta?
 
#* Costbook changes for currency and commodities price variations?
 
#* Costbook changes for currency and commodities price variations?
 +
# Calibration system update
 
# Any other business
 
# Any other business
  

Revision as of 11:06, 21 April 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: April 15, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Tentative Agenda

  1. FCAL Update
  2. BCAL Update plus continue discussion on topics below
    • Reanalysis of timing resolution from cosmics (Media:talk080415.pdf) - Andrei/Irina
    • SiPM gain non-uniformities and energy resolution [1] (Richard)
    • Monte Carlo progress
  3. Fiber Specifications
    • Do we need more samples?
    • How to specify a) Fiber color/spectrum and b) light output
  4. Review of Action Item Tracker
    • Fabrication plan and QA /visit to Alberta?
    • Costbook changes for currency and commodities price variations?
  5. Calibration system update
  6. Any other business

Minutes

Online: Elton, Beni, Tim, Richard, Curtis, Zisis, Andrei, George, Christina

  1. FCAL - no report
  2. BCAL
    • Timing resolution; no questions
    • Richard's report. It was agreed that Andrei, Beni and Richard (and anybody else interested) would connect through video conference to discuss this work. Zisis will post the time and date to halld-cal.
    • Zisis gave a report on MC activities in Regina. A talk will be given at the collaboration meeting.