April 21, 2008 Calorimetry

From GlueXWiki
Revision as of 11:12, 21 April 2008 by Zisis (Talk | contribs) (Minutes)

Jump to: navigation, search

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: April 15, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Tentative Agenda

  1. FCAL Update
  2. BCAL Update plus continue discussion on topics below
    • Reanalysis of timing resolution from cosmics (Media:talk080415.pdf) - Andrei/Irina
    • SiPM gain non-uniformities and energy resolution [1] (Richard)
    • Monte Carlo progress
  3. Fiber Specifications
    • Do we need more samples?
    • How to specify a) Fiber color/spectrum and b) light output
  4. Review of Action Item Tracker
    • Fabrication plan and QA /visit to Alberta?
    • Costbook changes for currency and commodities price variations?
  5. Calibration system update
  6. Any other business

Minutes

Online: Elton, Beni, Tim, Richard, Curtis, Zisis, Andrei, George, Christina, George V., Pavlos

  1. FCAL - no report
  2. BCAL
    • Timing resolution; no questions
    • Richard's report. It was agreed that Andrei, Beni and Richard (and anybody else interested) would connect through video conference to discuss this work. Zisis will post the time and date to halld-cal.
    • Zisis gave a report on MC activities in Regina. A talk will be given at the collaboration meeting.
  3. Fiber specs:
    • We need to order more fibers, and now 4-m length ones for more reliable extraction of attenuation length.
    • George and Elton will work together on the fiber specs to include the testing protocol.
  4. Action Tracker/Costbook
  5. George and Zisis are going to Alberta on April 28-30 to discuss the MOU and all related details for the construction of the BCAL modules.
    • Costbook: nothing specific, but there are concerns on currency fluctuation and prices of European and Japanese items. The project has contigency for these things.
  6. Calibration: George V. gave a report. Most parts are in and tests should start soon. George V. ran through the plans and hopes to have results in a few weeks.
  7. AOB