(Created page with "= Meeting Time and Place == Friday April 22 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - * Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf ** CPP...")
 
(Agenda)
 
(5 intermediate revisions by the same user not shown)
Line 4: Line 4:
  
 
== Agenda ==
 
== Agenda ==
* Safety -  
+
* Safety - poly tank fell off truck
* Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]]
+
* Work location status
 +
* still no budget to buy FCAL2 stuff
 +
* Accelerator schedule - HCO starts soon
 +
* Hall D SAD Tasks  
 
** CPP INstall  O:\halld_engineering\Installation Schedules
 
** CPP INstall  O:\halld_engineering\Installation Schedules
*** Microscope move/Hodoscope  - poly shieldingcomplete [[image:hodo7.png|thumb]]
+
*** Microscope move/Hodoscope  - poly shielding complete
 
*** Moveable Lead absorber - Tim to Write procedure
 
*** Moveable Lead absorber - Tim to Write procedure
*** Target - Bobby - fit check - need drawings
+
*** Target - Bobby - fit check - need drawings [[image:Target-cartridge-lead.png|thumb]]
 
*** Gas - Scot
 
*** Gas - Scot
*** Helium bag [[image:He_bag.jpg|thumb]]
+
*** Helium bag [[image:He_bag.jpg|thumb]][[image:Hebag_assy.png|thumb]]
 
** PS Parasitic Detectors stages  
 
** PS Parasitic Detectors stages  
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication
Line 25: Line 28:
 
* FCAL Insert Drawings
 
* FCAL Insert Drawings
 
* New Profiler install
 
* New Profiler install
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]]
+
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]][[image:TAC-3x3.png|thumb]]  
 
* Tagger Radiator Mod [[Media:Fork_mod.pdf]]
 
* Tagger Radiator Mod [[Media:Fork_mod.pdf]]
 
* Controls
 
* Controls
 
** Solenoid vacuum controls
 
** Solenoid vacuum controls
 
* General Maintenance
 
* General Maintenance
* On Call - Scot
+
* On Call - Josh
 
* ePAS Training and trial  https://www.jlab.org/esh/epas
 
* ePAS Training and trial  https://www.jlab.org/esh/epas
  
 
== Action Items ==
 
== Action Items ==
  
 +
* Prepare for HCO
 
* Set up next PS parasitic meeting
 
* Set up next PS parasitic meeting
* Decide on Goni maintenance
 
* Delineate ePAS permit requests for Isolation Certificate
 

Latest revision as of 10:15, 22 April 2022

Meeting Time and Place =

Friday April 22 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - poly tank fell off truck
  • Work location status
  • still no budget to buy FCAL2 stuff
  • Accelerator schedule - HCO starts soon
  • Hall D SAD Tasks
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move/Hodoscope - poly shielding complete
      • Moveable Lead absorber - Tim to Write procedure
      • Target - Bobby - fit check - need drawings
        Target-cartridge-lead.png
      • Gas - Scot
      • Helium bag
        He bag.jpg
        Hebag assy.png
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • Tagger controls UPS
    • BCAL Coldshot Chiller commissioning - Josh
    • Target/Goni Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation - Anthony gave presentation - file and instructions on O drive
  • FCAL Insert Drawings
  • New Profiler install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
    TAC-3x3.png
  • Tagger Radiator Mod Media:Fork_mod.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Josh
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Prepare for HCO
  • Set up next PS parasitic meeting