Difference between revisions of "April 22, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 6: Line 6:
 
* Safety -  
 
* Safety -  
 
* Work location status
 
* Work location status
* Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]]
+
* Accelerator schedule - HCO starts soon
 +
* Hall D SAD Tasks  
 
** CPP INstall  O:\halld_engineering\Installation Schedules
 
** CPP INstall  O:\halld_engineering\Installation Schedules
 
*** Microscope move/Hodoscope  - poly shielding complete  
 
*** Microscope move/Hodoscope  - poly shielding complete  

Revision as of 09:24, 22 April 2022

Meeting Time and Place =

Friday April 22 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety -
  • Work location status
  • Accelerator schedule - HCO starts soon
  • Hall D SAD Tasks
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move/Hodoscope - poly shielding complete
      • Moveable Lead absorber - Tim to Write procedure
      • Target - Bobby - fit check - need drawings
        Target-cartridge-lead.png
      • Gas - Scot
      • Helium bag
        He bag.jpg
        Hebag assy.png
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • Tagger controls UPS
    • BCAL Coldshot Chiller commissioning - Josh
    • Target/Goni Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation - Anthony gave presentation - file and instructions on O drive
  • FCAL Insert Drawings
  • New Profiler install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
    TAC-3x3.png
  • Tagger Radiator Mod Media:Fork_mod.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Josh
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Prepare for HCO
  • Set up next PS parasitic meeting