Difference between revisions of "April 25, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(7 intermediate revisions by 3 users not shown)
Line 19: Line 19:
 
#* Informal DIRC project meeting May 12, 9 am - noon
 
#* Informal DIRC project meeting May 12, 9 am - noon
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2017 Collaboration Meeting]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2017 Collaboration Meeting]
# Support structure update
+
# Support structure update (John)
 
# Optical box design update (Jason)
 
# Optical box design update (Jason)
 
# Electronics update
 
# Electronics update
#* MAPMT first articles update
+
#* MAPMT first articles update (Justin)
 
# Bar box transportation and monitoring
 
# Bar box transportation and monitoring
 
#* Camera monitoring system (Greg)
 
#* Camera monitoring system (Greg)
#* Monitoring logistics (John and Yunjie)
+
#* [https://halldweb.jlab.org/wiki/images/d/d9/DircMonitoringUpdate042517.pdf Monitoring logistics (John and Yunjie)]
 
#* Statement of work (Matt, All)
 
#* Statement of work (Matt, All)
 +
# Water System update (Tim) https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3274
 +
# Nitrogen Purge system update (Tom)
 +
# Drawings/installation procedure update (Stephanie)
 
# AOB
 
# AOB
 +
# [https://halldweb.jlab.org/wiki/images/c/ce/Calib_25_Apr_2017.pdf Simulation of the calibration system (Ahmed)]

Latest revision as of 13:11, 25 April 2017

Meeting Information

GlueX DIRC Meeting
Tuesday April 25, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John)
  3. Optical box design update (Jason)
  4. Electronics update
    • MAPMT first articles update (Justin)
  5. Bar box transportation and monitoring
  6. Water System update (Tim) https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3274
  7. Nitrogen Purge system update (Tom)
  8. Drawings/installation procedure update (Stephanie)
  9. AOB
  10. Simulation of the calibration system (Ahmed)