Difference between revisions of "April 25, 2017 DIRC"
From GlueXWiki
(→Agenda) |
|||
Line 31: | Line 31: | ||
# Drawings/installation procedure update (Stephanie) | # Drawings/installation procedure update (Stephanie) | ||
# AOB | # AOB | ||
+ | # [https://halldweb.jlab.org/wiki/images/c/ce/Calib_25_Apr_2017.pdf Simulation of the calibration system (Ahmed)] |
Latest revision as of 13:11, 25 April 2017
Meeting Information
GlueX DIRC Meeting
Tuesday April 25, 2017
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Informal DIRC project meeting May 12, 9 am - noon
- Collaboration Meeting
- Support structure update (John)
- Optical box design update (Jason)
- Electronics update
- MAPMT first articles update (Justin)
- Bar box transportation and monitoring
- Camera monitoring system (Greg)
- Monitoring logistics (John and Yunjie)
- Statement of work (Matt, All)
- Water System update (Tim) https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3274
- Nitrogen Purge system update (Tom)
- Drawings/installation procedure update (Stephanie)
- AOB
- Simulation of the calibration system (Ahmed)