Difference between revisions of "April 26, 2013 Installation"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Meeting Time and Place == Friday, April 26, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please...")
 
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
Line 23: Line 23:
 
# Announcements
 
# Announcements
 
# Updates to the Mechanical Installation Schedule ([[Media:Mar 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
 
# Updates to the Mechanical Installation Schedule ([[Media:Mar 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
+
# Electronics Installation Schedule (Fernando) [[https://halldweb.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
 
# Magnet Mapping (Tim)([[Media:Tagger mapping.jpg | Tagger Magnet Mapping system]])
 
# Magnet Mapping (Tim)([[Media:Tagger mapping.jpg | Tagger Magnet Mapping system]])
 
# Tagger Magnet Installation ([[Media:Vacuum chamber test fit.jpg | Vacuum chamber test fit]])
 
# Tagger Magnet Installation ([[Media:Vacuum chamber test fit.jpg | Vacuum chamber test fit]])

Latest revision as of 11:32, 31 March 2015

Meeting Time and Place

Friday, April 26, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#


Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

Agenda

  1. Announcements
  2. Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
  3. Electronics Installation Schedule (Fernando) [| Schedule]
  4. Magnet Mapping (Tim)( Tagger Magnet Mapping system)
  5. Tagger Magnet Installation ( Vacuum chamber test fit)
  6. Microscope Installation
  7. Tagger Array Installation
  8. Pair Spectrometer Installation
  9. BCAL Installation ( BCAL assy in hall)
  10. FCAL Insatllation
  11. TOF Installation
  12. FDC Installation
  13. CDC Installation
  14. A.O.B.

Minutes