April 29, 2022 Tech group SAD meeting
From GlueXWiki
Revision as of 09:45, 29 April 2022 by Whitey (Talk | contribs) (Created page with "= Meeting Time and Place == Friday April 29 2022 10:30am Hall D Counting House and Teams == Agenda == * Tom Carstens says hello * Safety - extension cords * still no budget t...")
Meeting Time and Place =
Friday April 29 2022 10:30am Hall D Counting House and Teams
Agenda
- Tom Carstens says hello
- Safety - extension cords
- still no budget to buy FCAL2 stuff
- Accelerator schedule - HCO starts soon
- Hall D SAD Tasks
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move/Hodoscope - complete
- Moveable Lead absorber - Tim to Write procedure
- Target - alignment/leaks- need drawings
- Gas - Scot/Chris
- Helium bag installed
- PS Parasitic Detectors stages - low priority
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108
- Tagger NMR repair - Scot
- Tagger controls UPS
- Target/Goni Turbo repair - Keith
- Move active collimator to 3.4mm hole
- CPP INstall O:\halld_engineering\Installation Schedules
Downstream vacuum pipe install
- TEDF work area move in June to test lab high bay
- FCAL Insert Drawings - almost complete
- need cooling pipe to chiller assy
- need dark room mod for eelectronic patch panels
- need installation drawing
- New Profiler install
- New 3x3 CCAL for TAC Media:CPP_TAC.pdf
- Tagger Radiator Mod Media:Fork_mod.pdf
- Controls
- FDC chiller cooling water flow
- FDC start up procedure with set point error
- General Maintenance
- On Call - Bobby
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Prepare for HCO
- Set up next PS parasitic meeting