(Created page with "__TOC__ = Meeting Time and Place = The meeting will be on Wednesday April 5, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327. =...")
 
(Agenda)
Line 20: Line 20:
 
= Agenda =
 
= Agenda =
 
# Announcements
 
# Announcements
 +
# [[GlueX-Collaboration-May-2017|Collaboration Meeting]] May 15-17, 2017
 
# Data Production
 
# Data Production
 
# Analysis Focus
 
# Analysis Focus

Revision as of 10:29, 5 April 2017

Meeting Time and Place

The meeting will be on Wednesday April 5, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Reconstruction & Analysis Studies Status

Agenda

  1. Announcements
  2. Collaboration Meeting May 15-17, 2017
  3. Data Production
  4. Analysis Focus
  5. This Week's Studies
  6. Any other studies
  7. Upcoming Study Schedule

This Week's Topics

  • Talks: Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • Talks should be limited to 10 + 5 minutes.

Data Production

  1. Monitoring Update --- Thomas Britton
  2. Calibration Update --- Sean Dobbs
  3. Preparing for the first Spring 2017 production launch
  4. Processing Update --- Alex Austregesilo

Analysis Focus: Total Cross Sections

  1. J/Ψ, φ --- Lubomir
  2. η, ρ, ω, φ --- Simon
  3. φ --- Thomas
  4. Any others?

Studies: Hit Efficiencies

(i.e. Is the detector working?) Updates on experiment, simulation, and the comparison between the two.

  1. CDC Hit Efficiencies --- Naomi Jarvis
  2. FDC Hit Efficiencies --- Alex Austregesilo
  3. BCAL Hit Efficiencies --- Elton Smith
  4. FCAL Hit Efficiencies --- Jon Zarling

Data Production Milestones

  1. Fri. April 7 - Finalize calibrations/software for low-rate running. Run final tests.
  2. Fri. April 14 - Start production for low-rate running.
  3. Fri. April 21 - Finalize calibrations/software for high-rate running. Run final tests.
  4. Fri. April 28 - Start production for high-rate running.

Upcoming Study Schedule

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes.
  • Next Week: Alignment & Track/Shower Efficiencies

(i.e. Is the reconstruction working?) Updates on experiment, simulation, and the comparison between the two.

  1. Drift chamber alignment --- Mike Staib
  2. Tracking Efficiencies --- Paul Mattione
  3. BCAL Shower Efficiencies --- Elton Smith
  4. FCAL Shower Efficiencies --- Jon Zarling
  • Week after next: Other
  1. Track / Hit Matching: BCAL, FCAL, TOF, SC --- Paul Mattione
  2. Efficiencies: TOF, SC
  3. Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
  4. Uncertainties: PID (BCAL, FCAL, TOF, dE/dx), Kinfit (BCAL, FCAL, tracking)
  5. Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
  6. Other reconstruction/analysis issues
  • The following week: Beamline & Triggering
  1. Flux --- Justin
  2. Beam energy --- Beamline Group
  3. Polarization (TPOL & lineshape) --- Beamline Group
  4. Beam Asymmetries --- Alex Austregesilo
  5. Trigger emulation --- Alex Somov
  6. Triggering efficiency --- Alex Somov