Difference between revisions of "Aug 16, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
Line 24: Line 24:
 
# BCAL
 
# BCAL
 
## Construction Status: builds, fibre QA
 
## Construction Status: builds, fibre QA
## USM test facility update
+
## [http://www.jlab.org/Hall-D/software/wiki/images/2/26/USM_Update-20110816.pdf USM test facility update: Alam Toro]
 
# Simulations/Reconstruction
 
# Simulations/Reconstruction
 
#*  [[media:New_bcal_recon.pdf | "New" BCAL Reconstruction Algorithm (Matt)]]
 
#*  [[media:New_bcal_recon.pdf | "New" BCAL Reconstruction Algorithm (Matt)]]

Revision as of 11:07, 16 August 2011

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Zisis will remind George to send Christina some pricing information for testing of monitoring boards.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status: mechanical, bases
  5. BCAL
    1. Construction Status: builds, fibre QA
    2. USM test facility update: Alam Toro
  6. Simulations/Reconstruction
  7. Beam tests in Hall B (fall 2011) (Kei)
  8. Any other business

Minutes

Attending: