Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
    • This specifically includes the settings for the pre-production boards that are needed by Wed of next week.
  2. Test wrapping forms (Elton)
  3. Order glue (and any other consumables) to glue light guides (Scot)
  4. Check new gluing jig for the light guides (Scot and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)

Minutes

Attending: