Aug 16, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 18:28, 9 August 2012 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Test wrapping forms (Elton)
  2. Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)

Minutes

Attending: