Difference between revisions of "Aug 18, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 25: Line 25:
 
= Agenda =
 
= Agenda =
  
# Reports
+
# Discussion
#* Geometry updates (Beni)
+
#* Geometry and drawings - sign off procedures
#** Now in the Repository are: 8mm Aluminum inside plate, FDC cables running upstream
+
#* Evaluation of bid responses to fiber RFPs.
#** Current studies by Matt and Blake on 3x3 and 6x4 readout without the above materials.
+
#* Discussion on agenda Items for collaboration meeting
#* Shower reconstruction (IU)
+
# Reports
#** [http://argus.phys.uregina.ca/gluex/DocDB/0010/001081/001/compare_33_64.pdf Comparison of 3x3 vs. 6x4 BCAL Inner Segmenation]
+
#* Geometry for simulations in repository (Beni)
#** [http://www.jlab.org/Hall-D/software/wiki/images/8/8b/Nonlin.pdf Non-linear photon energy corrections in the FCAL]
+
#* Updates on simulation of performance (Blake)
#* Discussion on resolution of various options
+
#* Preparations for construction (George and Jim)
 +
#* Measurements of fiber light output (Andrei)
 +
#** Preparations for fiber testing at JLab (Beni)
 
# Review of To-do List
 
# Review of To-do List
 
# Updates
 
# Updates
Line 38: Line 40:
 
#* FCAL
 
#* FCAL
 
#* BCAL
 
#* BCAL
#** preparations for fiber testing
 
#** SiPM [[Media:Bcal_drpde_tradeoff_pdetrend.pdf | PDE vs DR]]
 
 
# Any other business
 
# Any other business
  
 
=Minutes=
 
=Minutes=
 
Attending:
 
Attending:

Revision as of 10:13, 14 August 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: July 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

To-do List from previous meeting

  1. Identify files with new geometry (Beni)
  2. Estimates of pedestal width (electronic noise, etc.) for FM PMTs. The dark rate should be negligigle in this case.
  3. Resolution studies with up-to-date geometry (Blake)
  4. Resolution studies with different segmentation for the outer section.
  5. Add F100 rad hard glass to simulation.
  6. Calibration meeting Tues Aug 26
  7. Decision on Bcal sampling fraction needed by Sep.

Agenda

  1. Discussion
    • Geometry and drawings - sign off procedures
    • Evaluation of bid responses to fiber RFPs.
    • Discussion on agenda Items for collaboration meeting
  2. Reports
    • Geometry for simulations in repository (Beni)
    • Updates on simulation of performance (Blake)
    • Preparations for construction (George and Jim)
    • Measurements of fiber light output (Andrei)
      • Preparations for fiber testing at JLab (Beni)
  3. Review of To-do List
  4. Updates
    • Calibration system
    • FCAL
    • BCAL
  5. Any other business

Minutes

Attending: