Difference between revisions of "Aug 18, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Reference Documents)
Line 12: Line 12:
 
# Previous minutes: [[July 21, 2008 Calorimetry]]
 
# Previous minutes: [[July 21, 2008 Calorimetry]]
 
# [http://www.jlab.org/Hall-D/gluex_secure/ Schedule, Tracker and Drawings] (gluex pass)
 
# [http://www.jlab.org/Hall-D/gluex_secure/ Schedule, Tracker and Drawings] (gluex pass)
# [http://www.jlab.org/Hall-D/software/ScheduleIt/ Schedule]
 
  
 
= To-do List from previous meeting =
 
= To-do List from previous meeting =

Revision as of 10:17, 14 August 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: July 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)

To-do List from previous meeting

  1. Identify files with new geometry (Beni)
  2. Estimates of pedestal width (electronic noise, etc.) for FM PMTs. The dark rate should be negligigle in this case.
  3. Resolution studies with up-to-date geometry (Blake)
  4. Resolution studies with different segmentation for the outer section.
  5. Add F100 rad hard glass to simulation.
  6. Calibration meeting Tues Aug 26
  7. Decision on Bcal sampling fraction needed by Sep.

Agenda

  1. Discussion
    • Geometry and drawings - sign off procedures
    • Schedule for evaluation of bid responses to fiber RFP.
    • Discussion on agenda Items for collaboration meeting
  2. Reports
    • Geometry for simulations in repository (Beni)
    • Updates on simulation of performance (Blake)
    • Preparations for construction (George and Jim)
    • Measurements of fiber light output (Andrei)
      • Preparations for fiber testing at JLab (Beni)
  3. Review of To-do List
  4. Updates
    • Calibration system
    • FCAL
    • BCAL
  5. Any other business

Minutes

Attending: