Difference between revisions of "Aug 18, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 34: Line 34:
 
#* Geometry for simulations in repository (Beni)
 
#* Geometry for simulations in repository (Beni)
 
#* Updates on simulation of performance (Blake)
 
#* Updates on simulation of performance (Blake)
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1083 | Toy model for bcal timing] (Elton)
+
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1083 Toy model for bcal timing] (Elton)
 
#* Preparations for construction (George and Jim)
 
#* Preparations for construction (George and Jim)
 
#* Specifications for Lead procurement (Elton and George)
 
#* Specifications for Lead procurement (Elton and George)

Revision as of 17:40, 15 August 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: July 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)

To-do List from previous meeting

  1. Identify files with new geometry (Beni)
  2. Estimates of pedestal width (electronic noise, etc.) for FM PMTs. The dark rate should be negligigle in this case.
  3. Resolution studies with up-to-date geometry (Blake)
  4. Resolution studies with different segmentation for the outer section.
  5. Add F100 rad hard glass to simulation.
  6. Calibration meeting Tues Aug 26
  7. Decision on Bcal sampling fraction needed by Sep.

Agenda

  1. Announcements
    • Calibration meeting scheduled for Tuesday Aug 26. Are we on track for this?
  2. Discussion
    • Preparation for construction procurements in FY09
    • Geometry and drawings - sign off procedures
    • Schedule for evaluation of bid responses to fiber RFP.
    • Discussion on agenda Items for collaboration meeting
  3. Reports
    • Geometry for simulations in repository (Beni)
    • Updates on simulation of performance (Blake)
    • Toy model for bcal timing (Elton)
    • Preparations for construction (George and Jim)
    • Specifications for Lead procurement (Elton and George)
    • Measurements of fiber light output (Andrei)
      • Preparations for fiber testing at JLab (Beni)
  4. Review of To-do List
  5. Updates
    • Calibration system
    • FCAL
    • BCAL
  6. Any other business

Minutes

Attending: