Difference between revisions of "Aug 18, 2015 Cal F250"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Video Conferencing Information= ''<font color=red>Meeting Time: </font>'' # To join via a Web Browser, go to the page [https://bluejeans.com/907185247] https://bluejeans.co...")
 
Line 16: Line 16:
 
* JLab Phone in CC L207 is 757-269-7084
 
* JLab Phone in CC L207 is 757-269-7084
 
* Phone in the Regina Video-conference Suite is 306-585-4204
 
* Phone in the Regina Video-conference Suite is 306-585-4204
 
== Action Items ==
 
List of issues:
 
* Handling of pedestal subtraction for late pulses (leading to negative values)
 
* Why is the overhead in the file size so large (content is about 20%)?
 
  
 
== FA125's Useful Links ==
 
== FA125's Useful Links ==
Line 37: Line 32:
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2776 GlueX-doc-2776 Addendum to fadc250 firmware specifications]
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2776 GlueX-doc-2776 Addendum to fadc250 firmware specifications]
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2788 GlueX-doc-2788 Considerations for firmware updates to the Flash 250 for FCAL and BCAL]
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2788 GlueX-doc-2788 Considerations for firmware updates to the Flash 250 for FCAL and BCAL]
 +
 +
== Action Items ==
 +
 +
* Review abnormal conditions and how to deal with them.
 +
* Request way of specifying the start of the integration window after the threshold crossing
 +
* Consider integration window referenced to the peak (instead of the threshold crossing).
  
 
= Tentative Agenda =
 
= Tentative Agenda =
Line 43: Line 44:
 
# Action Items
 
# Action Items
 
# Updates
 
# Updates
## [https://logbooks.jlab.org/entry/3347898 Log Entry 3347898] Study of integration limits of BCAL signals
 
## [https://logbooks.jlab.org/entry/3347605 Log Entry 3347605] Study of integration limits of FCAL signals
 
 
# Discussion
 
# Discussion
## Computation of baseline (long-term) pedestal
 
##* Goal is to have a robust average of many samples, eliminating outliers that could affect the mean.
 
 
# Any other business
 
# Any other business
  

Revision as of 13:39, 12 August 2015

Video Conferencing Information

Meeting Time:

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204

FA125's Useful Links

References

Action Items

  • Review abnormal conditions and how to deal with them.
  • Request way of specifying the start of the integration window after the threshold crossing
  • Consider integration window referenced to the peak (instead of the threshold crossing).

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Updates
  4. Discussion
  5. Any other business

Minutes

Attendees: